The Dulacca Windfarm Project, located 250km west of Toowoomba, consisted of the construction of 43 wind turbines each up to 250m in height with over 40km of access roads, overhead and underground electrical cable reticulation and an electrical substation. During the two-year lifespan of the project DSQ provided MPK Kinetic with survey and drafting services including Detail Surveys, Construction Setout Surveys, Asconstructed Surveys, Machine Control and UAV Lidar scanning.